Seasons greetings from C.M.Ferrer 2023-2024
17/12/2023
Seasons greetings from Construccions Metàl·liques Ferrer team, and best wishes for the new year 2024.
17/12/2023
Seasons greetings from Construccions Metàl·liques Ferrer team, and best wishes for the new year 2024.
18/11/2023
We have manufactured and assembled a dry-storage in Alcaidesa Marina, Cadiz, a boat’s storage for 28 boats up to 8.0m length.
12/11/2023
Construccions Metàl·liques Ferrer is pleased to announce our presence at METS 2023 (Marine Equipment Trade Show) that will be held in Amsterdam RAI from 15th to 17th November 2023. Contact us to arrange a meeting.
08/10/2023
Construccions Metàl·liques Ferrer will attend the 61th edition of Barcelona International Boat Show that will be held from 11th to 15th October 2023. At our booth 587, we will show our whole range of products and solutions in floating structures like fix or floating concrete docks Unifloat®, aluminium docks Unideck®, walkways, gangways or…
05/10/2023
Puerto José Banús has awarded C.M.Ferrer, Bellingham Marine licensee in Europe, a design & build contract for the construction of 4 and 5 Piers at Puerto Banús Marina, located in Marbella, Spain. The phase 2 of the project consists of over 300 lineal meters of new concrete pontoons. The pontoons will be manufactured out of C.M.Ferrer’s…
01/04/2023
Puerto Banús already has the first phase of the renovation of its port facilities, with the first 300 m of the UNIFLOAT@ floating system, completely rust-free and with minimal maintenance, which makes the installation timeless and safe. At CM Ferrer-Bellingham Marine we are very happy to have successfully completed another project, satisfying…
05/02/2023
We have already installed our new rust-free UNIFLOAT©️-FRP©️ system at Quai C in Port Fontvieille. A high-level facility ready to serve the most demanding customers. We continue to introduce our new durable and resilient UNIFLOAT©️-FRP©️system, raising the level of comfort and safety to the maximum in marinas around the world.
18/12/2022
Seasons greetings from Construccions Metàl·liques Ferrer team, and best wishes for the new year 2023.
14/11/2022
Puerto José Banús has awarded C.M.Ferrer, Bellingham Marine licensee in Europe, a design & build contract for the construction of 6 and 7 Piers at Puerto Banús Marina, located in Marbella, Spain.The phase 1 of the project consists of over 300 lineal meters of new concrete pontoons. The pontoons will be manufactured out of C.M.Ferrer’s…
11/09/2022
C.M.Ferrer will attend the 60th edition of Barcelona International Boat Show 2022 that will be held from 12th to 16th October 2022.At our booth 480, we will show our whole range of products and solutions in floating structures like fix or floating concrete docks Unifloat®, aluminium docks Unideck®, walkways, gangways or dry storage Unistack®.
01/09/2022
C.M.Ferrer has installed a fixed platform, an aluminum walkway and 3 floating concrete dock at Vallcarca’s Port for the filming of a film.
03/07/2022
C.M.Ferrer has installed 30 meters of fixed steps to help during boat’s mooring at Portbou Port.
15/12/2021
Seasons greetings from Construccions Metàl·liques Ferrer team, and best wishes for the new year 2022.
01/10/2021
We have installed 1 pontoon of 13 meters of fixed aluminum docks in Port Fòrum.
12/09/2021
Construccions Metàl·liques Ferrer will attend the 59th edition of Barcelona International Boat Show that will be held from 12th to 17th October 2021. At our booth 583, we will show our whole range of products and solutions in floating structures like fix or floating concrete docks Unifloat®, aluminium docks Unideck®, walkways, gangways or…
01/09/2021
The installation of another Kiwi Homes modular house in Fornells de la Selva (Girona) was successfully completed in a single day. https://www.instagram.com/p/CTMx8lfopkF/?utm_medium=copy_link
27/05/2021
The installation of another Kiwi Homes modular house in Llinars del Vallès (Barcelona) was successfully completed in a single day. https://www.instagram.com/p/CPVm3FoI3mh/?utm_medium=copy_link
30/04/2021
We have installed 2 pontoons of 15 meters of fixed aluminum docks in Port Fòrum.
01/04/2021
The installation of a Kiwi Homes modular house in Torrelles was completed in a single day. https://www.instagram.com/p/CNH4wr2of3L/?utm_medium=copy_link
19/12/2020
Seasons greetings from Construccions Metàl·liques Ferrer team, and best wishes for the new year 2021.
25/05/2020
C.M. Ferrer has worked actively with the construction of the new port made by Bellingham Marine at Ayia Napa Marina, Cyprus. With hosting capacity of 600 yachts in wet and dry storage.
25/04/2020
C.M. Ferrer has manufactured 140 floats for catway for Ginásio Clube Naval de Faro, Portugal.
02/02/2020
C.M. Ferrer has manufactured 3 metal frame aluminum floating dock Unideck® for Porto di Ranco port in Italy.
19/12/2019
Seasons greetings from Construccions Metàl·liques Ferrer team, and best wishes for the new year 2020.
21/11/2019
Construccions Metàl·liques Ferrer is pleased to announce our presence at METS 2019 (Marine Equipment Trade Show) that will be held in Amsterdam RAI from 19th to 21th November 2019. Visit Bellingham Marine booth. Contact us.
02/11/2019
Construccions Metàl·liques Ferrer S.A. has manufactured and supplied 10 aluminum gangways of 24 meters long and 3 wide for the new port with Unifloat® floating concrete docks made by Bellingham Marine at Ayia Napa Marina, Cyprus.
02/09/2019
Construccions Metàl·liques Ferrer will attend the 58th edition of Barcelona International Boat Show that will be held from 09th3th to 14 October 2019. At our booth 583, we will show our whole range of products and solutions in floating structures like fix or floating concrete docks Unifloat®, aluminium docks Unideck®, walkways, gangways or…
02/06/2019
Construcciones Metálicas Ferrer S.A. has designed, manufactured and supervised the installation of 46 fingers for Valencia Mar before summer season. The aluminum fingers, combined with the existing concrete floating docks manufactured by Bellingham Marine, allows the marina to improve the service they offer to their customers.
19/12/2018
Seasons greetings from Construccions Metàl·liques Ferrer team, and best wishes for the new year 2019.
01/11/2018
Construccions Metàl·liques Ferrer is pleased to announce our presence at METS 2018 (Marine Equipment Trade Show) that will be held in Amsterdam RAI from 13h to 15th November 2018. We can arrange a meeting. Contact us.
03/09/2018
Construccions Metàl·liques Ferrer will attend the 57th edition of Barcelona International Boat Show that will be held from 10 to 14 October 2018. At our stand, you will be able to discover our whole range of products and solutions in floating structures like fix or floating concrete docks, aluminium docks, walkways, gangways or dry storage.…
22/05/2018
We are happy to announce that we have just redesigned our website! Streamlined navigation, responsive layout and more resources and information than ever. Stop by and start planning the project you’ve been dreaming of!
16/05/2018
We are so happy to announce that C.M.Ferrer has finally obtained the ISO 9001: 2015 Quality Management System Certificate and the Certificate of conformity of the factory production control: in Structural steel and structural aluminum components.
08/05/2018
Bellingham Marine & Construccions Metàl·liques Ferrer will attend the second edition of the International Boat Show Colombia Nautica that will be held from 1st to 3rd June 2018. At our stand, you will be able to discover our whole range of products and solutions in floating docks: concrete floating docks, aluminium docks……
19/12/2017
Seasons greetings from Construccions Metàl·liques Ferrer team.
17/11/2017
Construcciones Metálicas Ferrer has attended with Bellingham Marine the Marine Equipment Trade Show METS 2017 sharing a stand, that has been held in Amsterdam RAI from 14th to 16th November. Where we have exposed the whole range of products and solutions in floating structures that we could develop like floating concrete docks, floating or…
23/10/2017
The 56th edition of Barcelona’s Boat Show 2017 has been a good reflection of the marina sector growing, more than 64.000 people has visited the show. CM Ferrer has exposed the range of products and solutions in floating structures that could develop with the know-how of Bellingham Marine for the European marine market.
04/09/2017
Construccions Metàl·liques Ferrer will attend the 56th edition of Barcelona International Boat Show that will be held from 11 to 15 October 2017. At our stand, you will be able to discover our whole range of products and solutions in floating structures like fix or floating concrete docks, aluminium docks, walkways, gangways or dry storage.…
04/04/2017
Bellingham Marine & Construccions Metàl·liques Ferrer will attend the first edition of the International Boat Show Colombia Nautica that will be held from 27th to 30 April 2017. At our stand, you will be able to discover our whole range of products and solutions in floating docks. We will help you build a facility that will be…
13/02/2017
Construccions Metàl·liques Ferrer will be present at Girocàmping. You will find us in Palau Firal from 2nd to 5th March 2017, where we will show the whole range of Rollins Marine & Caravan Services products. We can arrange a meeting. http://www.girocamping.com/
20/12/2016
Seasons greetings from Construccions Metàl·liques Ferrer team.
24/11/2016
Construcciones Metálicas Ferrer has attended with Bellingham Marine the Marine Equipment Trade Show (METS 2016) with a stand, that has been held in Amsterdam RAI from 16th to 18th November. We have exposed the whole range of products and solutions in floating structures that we could develop like floating concrete docks, aluminum pontoons or gangways,…
20/10/2016
The 55th edition of Barcelona’s Boat Show 2016 has been a good reflection of the marina sector growing, more than 56.000 people has visited the show. CM Ferrer has exposed the range of products and solutions in floating structures that could develop like floating concrete docks, aluminum pontoons…
19/10/2016
Se ha instalado en la calle Trencabraços nº27 de la Escala, la segunda casa modular de H-KÜB con la estructura metálica hecha por Construcciones Metálicas Ferrer. La instalación in situ ha durado 2 días. Próximamente empezaremos a fabricar la tercera casa…
22/08/2016
Construccions Metàl·liques Ferrer will attend the 55th edition of Barcelona International Boat Show that will be held from 12 to 16 October 2016. At our stand, you will be able to discover our whole range of products and solutions in floating structures like floating concrete docks, aluminium poontons, gangways, walkways and dry storage.…
02/06/2016
Se ha instalado en la calle Montgó nº35 de la Escala, la primera casa modular de H-KÜB con la estructura metálica hecha por Construcciones Metálicas Ferrer. En menos de una semana, ya se ha podido entrar a vivir. Próximamente empezaremos a fabricar la segunda. Si quieres más información sobre Casas Modulares, visita: http://www.cmferrer.com/es/casas-modulares.html…
03/05/2016
Last week, more than 150 influential industry executives from Latin America, US, Canada and Europe united for the 2016 International Nautical Congress of Colombia in Cartagena de Indias held April 27-29. Organized by the newly established Colombia Nautica, (a joint venture between Asociación Náutica de Colombia (ANC), together with (NMMA), Centro…
04/04/2016
Bellingham Marine & Construccions Metàl·liques Ferrer will attend the first edition of Colombia Nautical Congress that will be held from 27th to 29 April 2016. Bellingham Marine is the Platinum sponsor for this show. At our stand, you will be able to discover our whole range of products and solutions in floating docks. We…
24/02/2016
Construcciones Metálicas Ferrer will assist at the IV Congreso Náutico, that will be held from 09th to 10th of March. The Congress will be based again on Torre Telefonica in Barcelona. Is managed by ANEN. You can see the program programa…