Projects - Los Nietos (Múrcia)

Los Nietos (Múrcia)

Moorage at Club Nautico Los Nietos was significantly improved thanks to a complete upgrade to the Port’s floating piers. Bellingham Marine Spain led the renovation which included the 400ml of metal frame dock system Unideck®.

This complete upgrade has 4 lines of 100m of metal frame dock with a gangway. The metal frame dock is anchored on chains that fix perfectly the 100m as one piece.

The Unideck ® system consists of structures made of aluminum, corrosion resistant, covered with decking and optionally bonded together by silent armed blocks.

The profiles have a top guide rail and two side rails which allow a sliding mounting cleats mooring, anchoring chain plates and other accessory port.

LocationMúrcia, Spain
Year 2011
SystemUnideck®