Projects - Sausset

Sausset

Bellingham Marine France build two metal frame dock Unideck® in Port du Sausset-les-Pins, between Port-de-Bouc and Marsella.

Bellingham Marine France made the renovation of the port which included two lines of 36ml of metal frame dock Unideck® each. The pontoons are fixed not floating, and the wide is 2,1m.

The breakwater of the port helps to minimize the internal agitation and in this case, a fixed pontoon is a good option as there are not so sea oscillations

LocationPort du Sausset-les-Pins, France
Year 2008
SystemUnideck®

Another projects

Valencia
València (Spain)
Port Fòrum Unistack
Barcelona (Spain)
Puerto Real (Roses)
Roses (Catalonia)
-->