Projets - Miralcamp

Miralcamp

Construcciones Metálicas Ferrer, has designed, built and installed a floating concrete pontoon Unifloat® 6x3m and a gangway of 20 meters made of hot dip galvanized steel for a water pompout installation in Miralcamp (Lleida). The technicians have to cross the 20 meters gangway to connect the water pomp-out.

This is a small project, where you can see the versatility of C.M.Ferrer, because join their experience in metalwork for more than 50 years with Bellingham Marine know-how in floating structures.

LocalisationMiralcamp, Catalonia
Année 2015
SystèmeUnideck®

Autres projets

Puerto Real (Roses)
Roses (Catalonia)
Cannes
Cannes (France)
Marina di Loano
Loano, Liguria (Italie)
-->