Projets - Sausset

Sausset

Bellingham Marine France build two metal frame dock Unideck® in Port du Sausset-les-Pins, between Port-de-Bouc and Marsella.

Bellingham Marine France made the renovation of the port which included two lines of 36ml of metal frame dock Unideck® each. The pontoons are fixed not floating, and the wide is 2,1m.

The breakwater of the port helps to minimize the internal agitation and in this case, a fixed pontoon is a good option as there are not so sea oscillations

LocalisationPort du Sausset-les-Pins, France
Année 2008
SystèmeUnideck®

Autres projets

Port Fòrum Unistack
Barcelona (Espagne)
Port Saint Jean
La Ciotat (France)
Cadaqués
Cadaqués (Costa Brava, CAT)
Los Nietos (Múrcia)
Múrcia (Espagne)
-->